Meeting/Event Information

 Directions

February 27, 2014

Tour of Miura boiler technology at Tröegs Brewing Company
February 27, 2014
5:00 PM - 8:00 PM
Tröegs Brewing Company
200 East Hersheypark Drive
Hershey, PA 17033
http://www.troegs.com/
Come and learn about Miura's boiler application with a tour of the Tröegs Brewing Company

$30.00 Member Ticket

$35.00 Non-member ticket

Come and learn about optimizing large-capacity thermal energy management with steam/hot-water boiler technology.  Miura boilers will demonstrate their technology combining on-demand load response with modular design for precise output-to-load configuration. Jason P. Smith, LEED A.P., Senior Manager - Sustainability, with Boilers Miura will offer lessons learned.  After the presentation, Miura will provide a tour of their application of this technology at Tröegs Brewing Company. 

Come early and don't miss the happy hour Miura is sponsoring from 5-6pm. 

Jason P. Smith, LEED A.P., Senior Manager - Sustainability, with Boilers Miura offers lessons learned optimizing large-capacity thermal energy management with steam/hot-water boiler technology combining on-demand load response with modular design for precise output-to-load configuration.

In effect, Miura's low-mass boiler technology approach brings the same level of energy performance recognized in residential tankless water heating to larger scale institutional and industrial applications. When combined with system modularity & robust controls integration,
this approach provides a unique tool for energy managers who historically have not considered boilers low-hanging-fruit for ECM's.

In concert with the technical presentation, Miura will host a tour of the modular boiler plant powering brewing production at Troeg's Brewing Co., showcasing a good local case study of this technology in an industrial process application.

Miura is the global leader in modular, on-demand boiler technology, with over 140,000 units in operation worldwide.  While Miura has a long-standing history of providing high-performance thermal energy solutions in Asia, we are celebrating our 20th anniversary manufacturing in Canada and  5th year manufacturing in the U.S.A. outside of Atlanta, GA.  Miura is pleased to offer a wide range of innovative products & services supporting optimized thermal energy management to help our clients achieve their “triple-bottom-line” goals.

Speaker Bio: Jason Smith has a background in Architecture & Engineering with over 15 years experience with the design and construction of high performance "green" buildings and over 8 years experience as a LEED Accredited Professional integrating sustainable design solutions into facilities that address energy efficiency and contribute to reducing their environmental impact.  

Jason is celebrating 5 years with Miura North America directing energy & environmental initiatives with a focus on energy efficiency advocacy, education & market transformation in the area of thermal energy systems.

Jason currently chairs the Energy Efficiency Deployment Sub-committee of the Department of Energy’s ITP BEST PRACTICES Steering Committee and is an active member of the following organizations devoted to energy efficiency & sustainability: AEE, ESC, ACEEE, ASE, IDEA, APPA, ASHE,& USGBC.

Future Meetings

November 18, 2014

Annual Energy Forum Event

November 18, 2014
5:30 PM - 8:30 PM

Armstrong World Industries, Main Campus
2500 Columbia Avenue
Lancaster, PA 17604

Energy Savings Opportunities presentations from Experts
 

January 14, 2015

CP AEE Tour of Four Seasons Produce

January 14, 2015
11:00 AM - 1:00 PM

Four Seasons Produce Inc.
400 Wabash Road
Ephrata, PA 17522-0788

What are deep energy retrofits?
 

February 26, 2015

Sustainable Energy Fund

February 26, 2015
11:00 AM - 1:00 PM

TBD



How do energy projects get financed?
 

March 26, 2015

Phoenix Contact

March 26, 2015
11:00 AM - 1:00 PM

PHOENIX CONTACT
586 Fulling Mill Road
Middletown, PA 17057
https://www.phoenixcontact.com/online/portal/us?1dmy&urile=wcm%3apath%3a/usen/web/main/products/entry_page/entry_page&cpn=hp-banner_STAGE_CLIP:%2060%20000%20Produkte

Combined Heating, Cooling, and Power Plant
 

April 23, 2015

LEED re-certification process

April 23, 2015
11:00 AM - 1:00 PM

Armstrong World Industries, Main Campus
2500 Columbia Avenue
Lancaster, PA 17604

What does it take to traverse through the LEED EBOM Recertification process?
 

May 28, 2015

Holtwood tour

May 28, 2015
11:00 AM - 1:00 PM

PPL Holtwood
482 Old Holtwood Road
Holtwood, PA 17532
http://www.pplweb.com/ppl-generation/ppl-holtwood.aspx

In 2010, PPL began a $438 million expansion project to add 125-megawatts in generating capacity, more than doubling Holtwood’s existing generating capacity.